Setting Up a Project for Analyses

Both the Schedule Risk Assessment and Sensitivity Analysis require, at a minimum, the following to be done before analyses are be performed:
The fields used in your project for this data can be selected from the Instructions & Setup tab of the Schedule Risk Analysis tool:
 
 