Very High Total Slack

 
What gets flagged by the Audit
A Task or Milestone with a value greater than the user defined or default value (44 days) of total slack.
 
Why does it matter if items in the project have Very High Total Slack?
Very high total slack is an indicator of missing predecessors or successors
 
Resolving Negative Slack
 
What Else to Consider
The DCMA 14 Point Assessment tests for "HIgh Float"
High Float: Number of activities with total float greater than two months. Should not exceed 5%